QTH: Difference between revisions

From PSRG Wiki
Jump to navigation Jump to search
Content deleted Content added
Created page with "'''Welcome to the Puget Sound Repeater Location (QTH) Tour''' The photos below were taken on 5/5/17 by KG7AUL, CK. 800px A view looking SE..."
 
No edit summary
Line 37: Line 37:
[[File:PSR-Equipment2.JPG|800px]]
[[File:PSR-Equipment2.JPG|800px]]


At bottom left is our new AllStar node as Cory NQ1E preps the LAN.
Looking downward from the 'battery percch' where one should water the batteries, once every 3 months.


[[File:PSR-24V-BatteryPack.JPG|800px]]

The batteries need water every 3 months. The syringe is used to bring the water level to the '''meniscus'''.



[[File:PSR-RoofView.JPG|800px]]
[[File:PSR-RoofView.JPG|800px]]

Revision as of 21:15, 9 May 2017

Welcome to the Puget Sound Repeater Location (QTH) Tour

The photos below were taken on 5/5/17 by KG7AUL, CK.

A view looking SE towards the school.


Last staircase through the teacher's lounge.


Wide shot of equipment table.


As shown in 19" rack (above):

-Motorola MTR2000 Transceiver

-ARGUS 24V Charge Controller

-Mikrotik RouterBoard modified to enclose RasPi 3 (EchoIRLP node) & HamWAN TCP/IP

-Furman 12V Load Conditioner

-BearCat receive only for Listen Online

-Mini Windows PC for MP3 Streaming


At bottom left is our new AllStar node as Cory NQ1E preps the LAN.


The batteries need water every 3 months. The syringe is used to bring the water level to the meniscus.


A view of downtown Seattle from the rooftop.